HEISCO'S ONGOING PROJECTS OVERVIEW

  • HEISCO is executing the Kuwait Integrated Digital Field (KWIDF) Jurassic Gas Field TechnicalSupport and Service project in Kuwait for KOC. This project is expected to be completed by Q32029, valued at USD 83.78 million.
  • Flowlines and Associated Works in West Kuwait Area 2 for KOC, to be completed by Q3 2028, witha contract value of USD 220.26 million.
  • HEISCO is enhancing safety and SCADA systems for Jurassic Wells in North Kuwait for KOC, withcompletion due in Q2 2028 and a contract worth USD 50.97 million.
  • The Upgradation of the Gas and Condensate Network at East Kuwait Area-I for KOC is underway,and the scheduled completion is Q1 2028, valued at USD 107.59 million.
  • In Saudi Arabia, HEISCO is actively engaged in the Qurayyah Expansion CCGT IPP project with TRfor Saudi Electricity Co. and the expected completion is by Q3 2027 and a contract worth USD138.80 million.
  • The South Kuwait Excavation, Transportation and Remediation (SKETR) project in Kuwait, aconsortium with ZAOPIN for KOC, is valued at USD 185.24 million and scheduled for completion by Q1 2027.
  • Water Facilities Upgrade for KOC in Kuwait is progressing and is expected to be completed by Q42026, with a value of USD 59.10 million.
  • HEISCO is developing Debottlenecking Production Facilities at Abqaiq, Saudi Arabia with ENPPI forSaudi Aramco, due by Q4 2026 and valued at USD 66.24 million.
  • The HEISCO is building two new 11 KV, 10 MW substations in Abdulliah and Dharif Areas for KOC,to be completed by Q4 2026 at USD 19.02 million.
  • Installation of C3/C4 Refrigeration Units and Storage Tanks at the Juaymah NGL Fractionation Plantin Saudi Arabia is underway with ENPPI for Saudi Aramco, scheduled for Q3 2026, worth USD139.61 million.
  • HEISCO, in consortium with IHI, is executing the Rehabilitation & Upgradation of Steam Boilers andControl Systems for Thermal Units and General Auxiliaries at Doha West Power and WaterDistillation Station for MEW. The project is valued at USD 285.74 million (Consortium contractvalue: USD 558.65 million) and is scheduled for completion by Q4 2030.
  • In consortium with MPL, HEISCO is carrying out Boiler Rehabilitation and Control SystemReplacement at Az-Zour South Power and Water Distillation Station for MEW. The project is valuedat USD 204.25 million (Consortium contract value: USD 439.71 million), with completion expectedby Q2 2030.
  • HEISCO is delivering Resident Scaffolding Services for EQUATE in Kuwait, with the contract runninguntil Q4 2029, valued at USD 11.30 million.
  • HEISCO is undertaking annual maintenance of mechanical equipment at Shuaiba South PowerStation for MEW, through Q4 2029, valued at USD 35.31 million.
  • HEISCO is responsible for the operations and maintenance of Bulk Chemical Facilities in the Southand East Kuwait areas for KOC, scheduled to be completed by Q2 2029, with a contract value ofUSD 62.90 million.
  • HEISCO is responsible for the operations and maintenance of Bulk Chemical Facilities in the Southand East Kuwait areas for KOC, scheduled to be completed by Q2 2029, with a contract value ofUSD 62.90 million.
  • Maintenance services for storage tanks at various KOC facilities in Kuwait and the work is expectedto be completed by Q1 2029 and valued at USD 41.96 million.
  • HEISCO is delivering mechanical maintenance services at Mina Abdullah Refinery for KNPC, withthe project running through Q4 2028 and valued at USD 295.11 million.
  • HEISCO is supplying Resident Manpower to EQUATE in Kuwait, under a contract valued at USD17.20 million, continuing through Q2 2028.
  • HEISCO is executing Resident Mechanical Construction Maintenance Services for EQUATE inKuwait, with a contract value of USD 4.69 million through Q4 2027.
  • Replacement of RMP and FUP demineralized water units at Mina Al-Ahmadi Refinery is underwayfor KNPC, valued at USD 13.69 million, to be completed by Q3 2027.
  • HEISCO is repairing Boilers and Auxiliaries at Doha East Power and Water Distillation Station forMEW, with completion expected by Q3 2027 and valued at USD 50.80 million.
  • Annual electrical equipment maintenance works are being carried out at Doha West Power andWater Distillation Stations for MEW, with contract value of USD 13.35 million scheduled throughQ3 2027.
  • Annual maintenance works for electrical equipment at Az-Zour South Power and Water DistillationStations for MEW, valued at USD 16.19 million are to be completed by Q3 2027.
  • HEISCO is rehabilitating Heat Exchangers in the South and East Kuwait areas for KOC, with acontract value of USD 2.19 million and completion expected by Q3 2027.
  • Repair and rehabilitation of Steam Turbines at Doha East Power and Water Distillation Station forMEW, with a contract value of USD 32.74 million, due by Q2 2027.
  • Rehabilitation of Seawater Inlet and Outlet Lines at Az-Zour South Power and Water DistillationStation for MEW, valued at USD 18.38 million is to be completed by Q2 2027.
  • HEISCO is segregating Coker Slops from other refinery slops at Mina Abdullah Refinery for KNPC, aproject valued at USD 4.47 million, due by Q4 2026.
  • Engineering, Procurement, Construction, Testing, and Commissioning of Replacement of burnerswith low-NOX type in-process heaters at Mina Al-Ahmadi Refinery for KNPC. This project is valuedat USD 2.08 million and is expected to be completed by Q4 2026.
  • Rehabilitation of plate and shell & tube-type Heat Exchangers in North and West Kuwait areas forKOC, scheduled through Q3 2026 and valued at USD 2.99 million.
  • At Mina Abdullah Refinery, HEISCO is installing a new Steam Turbine-driven Air Compressor forKNPC, valued at USD 8.30 million and due for completion by Q3 2026.
  • Construction and commissioning of a new 50% Caustic Tank with associated pumps and piping atMina Al-Ahmadi Refinery for KNPC is to be completed by Q2 2026 and valued at USD 1.52 million.
  • Calibration and comprehensive maintenance of Metering Systems at CNT areas are beingconducted for KOC in Kuwait, valued at USD 12.31 million, due by Q2 2026.
  • HEISCO is providing professional manpower supply services to KJO in Saudi Arabia, valued at USD5.86 million and continuing through Q4 2025.
  • Sea Cooling Tower SCT1 and 2 Stage 5 and 6 maintenance services are being executed for EQUATEin Kuwait, to be completed by Q4 2025, valued at USD 4.47 million.
  • Maintenance and refurbishment of mechanical seals and parts for Steam Power Plants at Az-ZourSouth Power Station for MEW is valued at USD 4.03 million and due by Q3 2025.
  • Maintenance and refurbishment of mechanical seals and parts for Gas Turbine Units, CombinedCycle, and RO units at the Az-Zour South Power Station for MEW is valued at USD 5.09 million, withcompletion by Q3 2025.
  • HEISCO is delivering general support services for LSP in Kuwait for JO under a contract valued atUSD 29.35 million, due by Q3 2025.
  • Fuel Oil Tank repair and life extension (Crude Oil, Heavy Oil, Diesel), including fuel lines at Az-ZourSouth Power and Water Distillation Station for MEW is scheduled to be completed by Q3 2025 witha value of USD 15.23 million.
  • Scaffolding works during the CFP block shutdown in Operation Area-10 (HROP B) at Mina Al-Ahmadi Refinery are being executed for KNPC, valued at USD 3.06 million, to be completed byQ3 2025.
  • Annual mechanical equipment maintenance at Az-Zour South Power and Water Distillation Stationis being carried out for MEW, valued at USD 108.12 million, with completion by Q2 2025.
  • HEISCO is performing the Decoking of various heaters by pigging method in KNPC refineries, withthe project valued at USD 13.09 million, due by Q2 2025.
  • Repair and Maintenance of Marine Vessels of Navy Force under Ministry of Defense and SupportingEquipment including the Spare Parts for a period of four years. The project is valued at USD 29.28million and is completing by Q3 2028.
  • Provision of Offshore Support Service for Marine Operations to KOC for offshore marine operations.The project is valued at USD 15.77 million and is to be completed by Q3 2028.
  • Provision of Marine Fleet Staff to KOC for Marine Operations. million, is scheduled for completion in Q1 2028.
  • Periodic Overhauling of KJO Owned four Marine Vessels for Al-Khafji Joint Operations. The USD3.14 million project will be completed by Q3 2027.
  • Maintenance and repair of Boats and Marine Equipment for the Kuwait Fire with a contract value ofUSD 2.93 million, expected to be completed by Q1 2027.
  • KNB Marine Construction and Repair for the U.S. Army Corps of Engineers. This project is valued atUSD 18.64 million and is scheduled to be completed by Q2 2025.
  • Maintenance, Repair, Installation and Supply of Spare Parts for Maritime Patrol Boats for Ministryof Interior (Kuwait Coast Guard), valued at USD 9.32 million and completing by Q2 2025.
  • Rehabilitation of Marine Unit Trailing Suction Hopper Dredger “Tahreer” for General Company forPorts of Iraq. This project is valued at USD 0.13 and is expected to be completed by Q2 2025.
  • HEISCO is carrying out fabrication works for KNPC, supporting various plant maintenance. Thisproject is valued at USD 1.92 million and is set to conclude by Q2 2025.
  • A project of supply and fabrication is underway for EQUATE valued at USD 0.46 million and will becompleted by Q2 2025.
  • HEISCO is delivering knock-out drum and internals for JO with the project valued at USD 0.26million and scheduled for completion by Q3 2025.
  • HEISCO is carrying out the supply of a liquid seal drum with ZEECO for JO, a project worth USD13.50 million, with completion expected by Q4 2025.
  • Replacement of Amine Regenerator Tower and Reboiler Shells at Mina Abdullah Refinery for KNPCvalued at USD 6.77 million and scheduled to be completed by Q4 2028.
  • HEISCO is executing flowline fabrication works for KOC to support field infrastructure, with a valueof USD 2.54 million and a target completion in Q4 2025.
  • HEISCO is supplying and fabricating a skimmer wall for MEW. This project is valued at USD 3.27million is scheduled for completion in Q2 2025
  • Supply and prefabrication of plates for MEW-57, valued at USD 2.45 million and expected tocomplete in Q2 2027.
  • HEISCO is supplying KNPC a Caustic Storage Tank, with a contract value of USD 0.17 million,completing in Q2 2025.
  • HEISCO is delivering shelters and pipe racks for KNPC, valued at USD 0.11 million, completing inQ2 2025.
  • HEISCO is carrying out structural and piping fabrication for KOC’s Water Facilities with a projectvalue of USD 1.40 million, set for completion in Q2 2025.
  • Fabrication of Piping Spools and supports for SCADA project of KOC with a value of USD 12.16million will be completed by Q3 2026.
  • HEISCO is supplying 88 structural skids for the KWIDF project of KOC, a USD 2.51 millionundertaking scheduled for completion by Q3 2026.
  • HEISCO is delivering Pig Traps and Drip Barrels to KOC, valued at USD 2.33 million and due in Q32026.
  • Boiler rehabilitation project at Az-Zour South Power Station (Units 1 & 2) for MEW, focusing on ductstructure, casing, buckstay, etc. The project is valued at USD 19.42 million and is scheduled to becompleted in Q4 2028.
  • HEISCO is executing duct and piping fabrication works for MEW-44 as part of the Doha West BoilerRehabilitation, with a value of USD 10.48 million and completion scheduled for Q4 2028.